At Victoria/Albert Street, we lined the Ōrākei Main Sewer with GRP while maintaining live sewer operations, using a 1m diameter TBM for bypass. The project demanded specialist tunnelling expertise, stringent environmental controls, and specific execution within an active urban transport corridor.