The new three-flight steel stair structure was fabricated off-site and installed in sections, supported by precast concrete landings and anchored with deep piles. Additional works included a cast in-situ concrete retaining wall, hardwood handrails, and integrated lighting. Working within an urban coastal environment, the project required careful stakeholder coordination, with access restrictions and environmental protections carefully managed.