Prefabricated elements allowed for rapid installation, with decking completed in two days and the bridge’s structure installed in just four days.
With limited site access in a developed urban reserve, a 400T crane was used to position piling equipment, avoiding unnecessary ground disturbance. Despite severe weather, including the 2023 Auckland floods, the project was completed on time and within budget. Strong environmental controls and a WorkSafe-endorsed safety approach ensured minimal impact on the surroundings while delivering a high-quality, visually striking bridge that integrates seamlessly into the development.