Oxcon’s value engineering expertise resulted in cost savings by optimising the piling methodology, shifting from permanently cased bored piles to Continuous Flight Auger piles, reducing material costs while maintaining structural integrity. The bridge was delivered two weeks ahead of schedule, under budget, and to the highest quality standards, with a Waewae Pakura pattern barrier finish that was refined using 3D printing technology for precision casting by Preco.