Concrete and timber piles were installed at each end to support the structure, which was completed with timber decking, steel handrails, and upgraded footpaths.
With significant traffic management and service relocations, careful coordination ensured minimal disruption. A temporary works platform stabilised construction within the stream, reducing environmental impact. Delivered ahead of schedule, the bridge enhances connectivity and safety for pedestrians and cyclists.