The project includes the stabilisation of a slip using piling, reconstruction of the lower carpark, installation of a new access stairway, replacement of the boundary wall, and repair of the electrical building.
The lower carpark was successfully reconstructed ahead of schedule, ensuring the stadium could accommodate a major event without disruption.